Our Services
Beilun Zhejiang Electric Power Photovoltaic-Storage Fully Distributed Project
Scale: 88 kW photovoltaic system + 100 kW/215 kWh energy storage system + charging stations (60 kW + 120 kW) Project Scope: EPC general contracting Location: Beilun District, Ningbo City Completion Date: December 2023
View Details
Project Scope: Four distribution substations with a total installed capacity of 16,000 kVA and 96 charging piles, each rated at 120 kW. Project Location: Jiangbei District, Zhenhai District, and Yinzhou District of Ningbo City. Scope of Work: EPC. Commissioning Date: 2022.
View Details
Project Scope: Two distribution rooms with a total installed capacity of 2,500 kVA and 30 charging piles, each rated at 80 kW. Project Location: Beilun District and Yinzhou District, Ningbo City. Scope of Work: EPC. Commissioning Date: 2021.
View Details2017 BYD Pure Electric Bus Charging Infrastructure Construction Project
Project Scope: Two distribution substations with a total installed capacity of 17,600 kVA and 130 charging piles, each rated at 120 kW. Project Location: Jiangbei District, Zhenhai District, and Yinzhou District of Ningbo City. Project Scope: EPC. Commissioning Date: 2017.
View Details
Project Scope: The transmission line starts at the Daxie 220 kV Leng’ao Substation in Beilun and ends at the Wanhua 110 kV Logistics Substation. The double-circuit cable line has a total length of 1.78 km, while the optical cable is a 24-core non-metallic flame-retardant fiber optic cable with a total installed length of 2.3 km, connecting the Leng’ao Substation to the Logistics Substation. Project Location: Beilun District, Ningbo Project Scope: Maintenance and Upkeep
View Details
Project Scope: 2 main transformers, 7 110 kV GIS switchgear cabinets, 23 35 kV GIS switchgear cabinets, 2 sets of SVG dynamic reactive power compensation devices, and other electrical equipment; Project Location: Beilun District, Ningbo Scope of Work: Maintenance and Upkeep
View Details
Project Scope: Four 180 MVA 220 kV transformers, six 120 MVA 110 kV transformers, and other ancillary equipment and external power lines. Project Location: Beilun District, Ningbo Project Scope: Maintenance and Upkeep
View DetailsNingbo Haoyang New Materials Technology Co., Ltd. Distributed Photovoltaic Power Generation Project
Capacity: 7,200 kW Project Scope: EPC General Contracting + Power Plant O&M Location: Yuyao City, Ningbo Municipality Completion Date: December 2022
View DetailsShenzhou Textile Photovoltaic Curtain Wall Demonstration Project
Project Scale: 500 square meters Project Location: Ningbo, Zhejiang Province Scope of Work: EPC General Contracting Commissioning Date: 2021
View Details220 MW Photovoltaic Power Generation Project in Shiqiao Town, Taibai Lake New Area
EPC General Contracting Project for Survey and Design Services Installed Capacity: 220 MW Project Location: Jining, Shandong Province Scope of Work: Design Commissioning Date: 2025
View DetailsHuaxi New Energy Technology Co., Ltd. 120 MW Photovoltaic Power Generation Project
Installed capacity: 120 MWp, grid-connected at 110 kV Project location: Yanzhou, Shandong Province Scope of work: EPC Commissioning date: 2019
View Details
8,441.95 kWp + 3 MW/6 MWh Solar-plus-Storage EPC Project Project Scale: 8,441.95 kWp of photovoltaic capacity plus a 3 MW/6 MWh energy storage system Project Location: Rugao County, Nantong City, Jiangsu Province Scope of Work: EPC General Contracting Commissioning Date: 2023
View DetailsEPC Project for the 11.6 MW/22.35 MWh Energy Storage Project at Xiangshan Huaxiang
Project Scale: 11.6 MW/22.35 MWh energy storage project Project Location: Xiangshan District, Ningbo City, Zhejiang Province Scope of Work: EPC general contracting Commissioning Date: Under construction; expected in 2025
View DetailsNingbo Xusheng Automobile Co., Ltd. (Third Factory) Photovoltaic-Storage Power Generation Project
The photovoltaic–energy-storage power station project of Ningbo Xusheng Automobile Co., Ltd. (Third Factory) has an energy-storage capacity of 0.5 MW/1 MWh and is located in the Beilun District of Ningbo City. Our company is responsible for providing EPC turnkey services for this project, which was successfully completed and put into operation in November 2020. This project marks Zhejiang Province’s first user-side megawatt-scale integrated photovoltaic–energy-storage station.
View Details1.2 MW/2.4 MWh Smart Energy Storage Project on the User Side of Sanwei Datong
This project is a 1.2 MW/2.4 MWh smart energy storage system on the user side in Datong, with a storage capacity of 1.2 MW/2.4 MWh. The project is located in Haiyan County, Jiaxing City, and our company is responsible for providing EPC general contracting services. The project was successfully completed and put into operation in 2023.
View DetailsJiaxing Samsung Textile Co., Ltd. 0.5 MW/1 MWh Smart Energy Storage Project
This project is the 0.5 MW/1 MWh smart energy storage system for Jiaxing Samsung Textile Co., Ltd., with a battery storage capacity of 0.5 MW/1 MWh. Located in the Xuzhou District of Jiaxing City, our company is responsible for providing EPC turnkey services for this project. The project was successfully completed and put into operation in 2023, marking the first user-side smart energy storage project in the Xuzhou District of Jiaxing City.
View DetailsNingbo Peiyuan Co., Ltd. 1 MW/2 MWh User-Side Energy Storage Project
Ningbo Peiyuan Co., Ltd.’s 1 MW/2 MWh user-side energy storage project has a storage capacity of 1 MW/2 MWh and is located in Dongqiao Town, Haishu District, Ningbo City. Our company is responsible for providing EPC turnkey services for this project, which was successfully completed and put into operation in 2022.
View Details
Project Scale: 200 MW/400 MWh Energy Storage Project Location: Wuyi, Jinhua Project Scope: Design Commissioning Date: Completed
View DetailsNinghai Shuangyili Power Supply Project
This project is located in Ninghai County, Ningbo City, and is currently under construction. It involves the construction of a new 3.1-km-long 35-kV double-circuit overhead transmission line and a new 4.8-km-long single-circuit cable line. The overhead conductors will be JL/LB20A-240/30 aluminum-clad steel-core aluminum stranded conductors, the overhead ground wires will consist of two 24-core fiber-optic composite overhead ground wires, and the cables will be YJV-26/35-1×300 mm² cross-linked polyethylene-insulated power cables.
View Details
This project is located in Laizhou City, Shandong Province, and involves substantial construction work. The new 35 kV four-circuit overhead line has a total length of 7.6 km, while the double-circuit overhead line spans 0.5 km. The conductors are JL/LB20A-240/30 aluminum-clad steel-core aluminum stranded conductors, and the overhead ground wire consists of two 48-core fiber-optic composite overhead ground wires.
View DetailsMajor Overhaul of Aging Tower 7723 on State Grid Zhejiang Ningbo 110kV Caiyin Line 1297
This project is located in Yinzhou District, Ningbo City, and has now been completed and put into operation. The newly constructed line route has a length of 0.301 km. The new transmission conductors are JL/G1A-300/40 steel-core aluminum stranded conductors, and the two ground wires are both OPGW-13-90-1 optical fiber composite overhead ground wires.
View Details
This project is located in the Jiangbei District of Ningbo City and has now been completed and put into operation. The newly constructed transmission line has a length of 0.751 km. The new conductor is JL/G1A-300/40 steel-core aluminum stranded wire, and both ground wires are OPGW-13-90-1 optical fiber composite overhead ground wires.
View DetailsMajor Overhaul of Aging Tower 7722 on State Grid Zhejiang Ningbo 110kV Tunheng Line 1355
This project is located in Cixi City, Ningbo Municipality, and has now been completed. The scope of work includes the replacement of conductors and hardware at two locations on the 110 kV Tunheng Line 1355 that currently use explosion-pressed tubes: specifically, the three-phase conductors between Tower 8 and Tower 9, and the B and C phase conductors between Tower 22 and Tower 27. The total length of the replaced conductor section is 1.505 km, with the new conductors being JL/G1A-240/40 steel-core aluminum stranded conductors. The ground wires are all OPGW-10-50-1 optical fiber composite overhead ground wires, with a total length of 8.23 km.
View DetailsNingbo 110kV Juzi–Beilun Power Line 6–Power Line 7 Relocation and Reconstruction Project
This project is located in Beilun District, Ningbo City, and has now been completed. A new double-circuit overhead transmission line with a total length of 0.235 km has been constructed, utilizing JL/G1A-300/40 steel-core aluminum stranded conductors for the phase conductors and two OPGW-13-90-1 optical ground wires for the shield wires.
View Details
This project is located in Taizhou City and has now been completed. The scope of the project involves the installation of 360 sets of line surge arresters on seven transmission lines, including the 220 kV Jingzhou–Zhoushan Line 24F4.
View Details
This project is located in Beilun District, Ningbo City, and is currently under construction. It involves the construction of 2.6 km of new double-circuit overhead lines and 2.74 km of new single-circuit overhead lines. Conductor: 2×JL/LB20A-630/45 aluminum-clad steel-core aluminum stranded conductor is used. Ground wire: Two OPGW-120 optical fiber composite ground wires are employed.
View DetailsState Grid Zhejiang Taizhou 220kV Guanghai Line 2352 Guyed Tower and Ground Wire Renovation Project
This project is located in Linhai City, Taizhou. The project has now been completed. The renovation involves the construction of two new single-circuit angle-steel towers and the replacement of two ground wires between spans 24 and 43 with JLB20A-70 aluminum-clad steel stranded conductors, spanning a total route length of 8.355 kilometers. In addition, two existing single-circuit guyed towers have been dismantled.
View DetailsReconstruction Project for 220kV Jiaoda Line 2311 and Jiaopeng Line 2314, Sections 42–44
This project is located in Zhenhai District, Ningbo City, and is currently under construction. The project is being built to the “three-span” standard, with a newly constructed double-circuit overhead transmission line measuring 0.612 km in length. Conductor: 2×JL/G1A-630/45 steel-core aluminum stranded conductor. Ground wire: two 72-core OPGW optical fiber composite overhead ground wires are used.
View Details
This project is located within Ninghai County and Fenghua District of Ningbo City and has now been completed. The 220 kV Xikou Traction Substation is supplied with power from the 220 kV Yancang Substation, and the newly constructed transmission line has a total length of 42.75 km. Conductor: 2×JL3/G1A-400/35. Ground wire: two 36-core OPGW cables.
View Details
The Jianfa Yangyun project is located in the Jiangbei Wantou area, at the intersection of Xiajiang Road and Wantou Road, covering a land area of 18,160 square meters with a total floor area of approximately 70,000 square meters.
View Details